Forest Bend Fire Department
T-126 Construction

These are pictures of T-126 during various stages of construction.

Here are some pics of our Silver Eagle at the North Carolina Plant just before it left for New York to have the ladder put on:

 

DSC00006.jpg (225937 bytes)

Here are some pictures of Truck 26 shortly after it arrived at the 
R.D. Murray facility in Hamburg, NY.  Here it will have the stainless steel body constructed and fitted to the Eagle chassis.

T-26 5.jpg (35475 bytes)  T-26 7.jpg (40317 bytes)  T-26 6.jpg (33718 bytes)  T-26 8.jpg (44229 bytes)T-26 2.jpg (25246 bytes)  T-26 3.jpg (34890 bytes)  T-26 10.jpg (28133 bytes)  T-26 12.jpg (36524 bytes)T-26 4.jpg (35653 bytes)  T-26 13.jpg (15886 bytes)  T-26 9.jpg (27898 bytes) T-26 11.jpg (18496 bytes)

Here are some pictures of Truck 26 taken during the final inspection 
at the R.D. Murray facility in Hamburg, NY.  All striping and lettering will be done once it has arrived at the Houston Freightliner Facility.

T2642501-019.JPG (49813 bytes) T2642501-033.JPG (47800 bytes) T2642501-001.JPG (44079 bytes)  T2642501-002.JPG (47817 bytes)  T2642501-003.JPG (53706 bytes)  T2642501-004.JPG (54689 bytes)  T2642501-005.JPG (53079 bytes)  T2642501-007.JPG (49829 bytes)  T2642501-008.JPG (51201 bytes)  T2642501-020.JPG (49795 bytes)  T2642501-021.JPG (34131 bytes) T2642501-022.JPG (52714 bytes) T2642501-029.JPG (35830 bytes) T2642501-030.JPG (43013 bytes) T2642501-031.JPG (54599 bytes) T2642501-032.JPG (56685 bytes)  T2642501-024.JPG (49221 bytes) T2642501-034.JPG (37848 bytes) T26VIEW42501-001.JPG (39451 bytes) T26VIEW42501-002.JPG (43955 bytes)